



STRUCTURAL MONITORING
Receive Early Warnings of Structural Deformation
Allowing your construction methods to be efficiently & safely modified.
Confirm Movement Predictions and Warn of Excess Movement
Measure Deformation, Settlement, Convergence, Divergence & Deflection using a variety of automated & manual methods.
Real-time Structural Health Monitoring
Camera based measurement systems providing non-contact measurement for predictive maintenance.
Alarms for Excess Movement
clearly presented
real-time reports
with automatic alerts
Real-time Monitoring
Delivered in real time using cloud-based software.
Data presentation
Reports delivered in the form which best suits your requirements i.e.
– Excel spreadsheet
– Written report
– Secure website you can log into at any time to view data tables, graphs and periodic reports.Automatic Alerts
Get alerted automatically by SMS, email, siren or flashing light if a parameter exceeds a set threshold.

WHAT CLIENTS ARE SAYING
“Jon’s extensive knowledge and experience in all areas of monitoring and engineering surveying has been invaluable to Lane and Frankham.
Communication and attention to detail is always exemplary.
The desire to help develop bespoke solutions for our clients’ diverse range of issues is key to our working relationship, we look forward to many more successful projects in collaboration with Jon in the future”
Nigel Coote | Survey Manager | Lane & Frankham

WHAT CLIENTS ARE SAYING
The monitoring carried out by Measurex gave us a great deal of confidence and enabled us to progress with the dismantling of steel bridge bracing. This gave us the security required to carry out the works in a controlled manner which offered us the protection to both the workforce and the general public.
The monitoring extended for several weeks after the works and allowed us to monitor settlement and to be aware of any need to resort to our reactive emergency plan.
The use of the monitoring stations gave a very high degree of accuracy and was sensitive to the small of movements which would not have been possible with traditional visual inspections.
Gary Fraser | Principal Project Engineer | Clackmannanshire Council



